• frezik
    link
    fedilink
    arrow-up
    3
    ·
    9 days ago

    Gut enough drywall to put in actual electrical. Repaint after that. On the workshop side, put drywall on the ceiling and top it off with blown insulation. Needs some kind of heater over there.

    Drop $100k at least to make things reasonable. That’s just from the obvious stuff in the pictures.