I placed a low bid on an auction for 25 Elitedesk 800 G1s on a government auction and unexpectedly won (ultimately paying less than $20 per computer)

In the long run I plan on selling 15 or so of them to friends and family for cheap, and I’ll probably have 4 with Proxmox, 3 for a lab cluster and 1 for the always-on home server and keep a few for spares and random desktops around the house where I could use one.

But while I have all 25 of them what crazy clustering software/configurations should I run? Any fun benchmarks I should know about that I could run for the lolz?

Edit to add:

Specs based on the auction listing and looking computer models:

  • 4th gen i5s (probably i5-4560s or similar)
  • 8GB of DDR3 RAM
  • 256GB SSDs
  • Windows 10 Pro (no mention of licenses, so that remains to be seen)
  • Looks like 3 PCIe Slots (2 1x and 2 16x physically, presumably half-height)

Possible projects I plan on doing:

  • Proxmox cluster
  • Baremetal Kubernetes cluster
  • Harvester HCI cluster (which has the benefit of also being a Rancher cluster)
  • Automated Windows Image creation, deployment and testing
  • Pentesting lab
  • Multi-site enterprise network setup and maintenance
  • Linpack benchmark then compare to previous TOP500 lists
  • ares35@kbin.social
    link
    fedilink
    arrow-up
    10
    arrow-down
    1
    ·
    edit-2
    8 months ago

    a pallet of 4th gens? i have a dozen left here from around that era that i can’t get rid of without literally giving them away. they’re ‘tolerable’ for a gui linux or win10 with an ssd, but the ‘performance per watt’ just isn’t there with hardware this old. i used a few of them (none in an always-on role, though), but the rest just sit in the corner, without home nor purpose.

    these 800 g1s are, iirc, 12vo, so upgrade or reuse potential is a bit limited. most users would want windows, and win10 does run ‘ok enough’ on 4th gen, just make sure they’re booting from ssd (120gb minimum). but they’ll run into that arbitrarily-errected wall-of-obsolescence with trying to upgrade or install win11 when win10 retires in ~ 18 months (you can ‘rufus’ a win11 installer, but there’s no guarantee that you will be able to in the future). that limits demand and resale value of pretty much all the pre-8th gen hardware.

    • Trainguyrom@reddthat.comOP
      link
      fedilink
      English
      arrow-up
      10
      ·
      8 months ago

      I think you’re not giving 4th gen enough credit. My wife’s soon-to-be-upgraded desktop is built on a 4th gen i5 platform, and it generally does the job to a decent level. I was rocking a 4790k and GTX970 until 2022, and my work computer in 2022 was on an even older i5-2500 (more held back by the spinning hard drive than anything. Obviously not a great job, but I found something much better in 2022) my last ewaste desktop-turned-server was powered by an i5-6500 (which is a few percentage points better performance than the 4th gen equivalent) and I have a laptop I use for web browsing and media consumption that’s got a 6700HQ in it.

      I’ve already got a few people tentatively interested, and I honestly accepted the possibility of having to pay to recycle them later on. Should be a fun series of projects to be had with this pallet of not-quite-ewaste