• Dem Bosain
    link
    fedilink
    arrow-up
    4
    ·
    10 个月前

    You’re getting downvoted but absolutely right. The pressure on engineers to reduce cost, weight, cost, cost, and weight is immeasurable. This should have been caught in PT testing, and also after the first recall, but mid-level managers are very willing to sign off on engineering changes if there’s any chance of reducing cost. And weight. But mostly cost.