Shuttering of New York facility raises awkward climate crisis questions as gas – not renewables – fills gap in power generation

When New York’s deteriorating and unloved Indian Point nuclear plant finally shuttered in 2021, its demise was met with delight from environmentalists who had long demanded it be scrapped.

But there has been a sting in the tail – since the closure, New York’s greenhouse gas emissions have gone up.

Castigated for its impact upon the surrounding environment and feared for its potential to unleash disaster close to the heart of New York City, Indian Point nevertheless supplied a large chunk of the state’s carbon-free electricity.

Since the plant’s closure, it has been gas, rather then clean energy such as solar and wind, that has filled the void, leaving New York City in the embarrassing situation of seeing its planet-heating emissions jump in recent years to the point its power grid is now dirtier than Texas’s, as well as the US average.

    • givesomefucks@lemmy.world
      link
      fedilink
      English
      arrow-up
      7
      arrow-down
      2
      ·
      8 months ago

      A leaky containment unit isn’t a hole in a bike tire, you can’t just get it patched.

      And to get a new one in, you’re going to have to be ripping out other systems and literally knocking down walls.

      By “replace the reactor”. I meant containment and primary systems. Secondary system probably didn’t have major issues because it’s basically normal plumbing at that point. But it’s so cheap it would be stupid to not replace it as well.

      But the carbon downside to nuclear is the carbon release from the concrete stacks (cloud makers). So even if literally everything else needed to be replaced, it still would have been worth it.

      If the stacks were fucked, yeah, it’s not salvageable.

      You’d literally be demolishing everything onsite and then building a new one. That’s not even ship of Thesius level “repair”. Everything would be removed and then you’d start fresh.

      • IrateAnteater@sh.itjust.works
        link
        fedilink
        arrow-up
        7
        ·
        8 months ago

        Indian Point was water cooled, hence the river water leakage and heating concerns. Water cooled plants don’t have those huge stacks you’re talking about. Those only exist on air cooled plants.

        • givesomefucks@lemmy.world
          link
          fedilink
          English
          arrow-up
          1
          arrow-down
          2
          ·
          8 months ago

          You’re right.

          I saw the giant concrete enclosure in the pic and my brain just saw it as a stack.

          So yeah, to get the actual containment unit replaced, everything would have to be destroyed and replaced.