• Thevenin@beehaw.org
    cake
    link
    fedilink
    arrow-up
    3
    ·
    1 month ago

    Even with unlimited funding, you want to scale the size of the train to the population that could potentially ride on it.

    A P42 locomotive pulling 7 Amtrak superliner cars is 700 tons of steel getting 0.4 miles per gallon of diesel. That’s a crapton of mining and drilling and CO2, and it would be incredibly wasteful if it ended up carrying, like, two people at a time.