They are a lot more expensive than expected at the moment, once they start selling at the 30$/KWh they were proposed at they will be fantastic but if they stay at their current price LFP is going to be a lot cheaper.
Yep your not wrong. In my local area, they are starting to use them for the grid. I know one of the engineers over at a local makerspace. The process is getting refined ATM. Its cool this and concrete power cells are becoming a thing.
They are a lot more expensive than expected at the moment, once they start selling at the 30$/KWh they were proposed at they will be fantastic but if they stay at their current price LFP is going to be a lot cheaper.
Yep your not wrong. In my local area, they are starting to use them for the grid. I know one of the engineers over at a local makerspace. The process is getting refined ATM. Its cool this and concrete power cells are becoming a thing.